SEO questions ยท SEO consulting
Short answer
It is the observation that a small share of your effort produces most of your results: a few pages earn most of the traffic, a few fixes deliver most of the gain, and a few links do most of the work. The numbers are never exactly 80 and 20. The useful part is the habit of finding the few things that matter and deliberately ignoring the rest.
The Pareto principle gets applied to everything, and SEO is a good fit for it. In almost every audit I do, the list of possible improvements runs to hundreds of items, and three or four of them account for most of what is actually holding the site back. Finding those is most of the job.
Where it shows up in SEO
Pages. On most sites, a small number of pages bring in most of the search traffic and most of the enquiries. Across the web, the skew is extreme: Ahrefs found 96.55% of 14 billion pages get no Google traffic at all. On your own site, the pattern is usually milder but the same shape.
Fixes. A typical audit tool flags hundreds of issues. A handful actually affect rankings. The rest are cosmetic, or apply to pages nobody visits.
Queries. A few search terms bring most of your valuable visitors. The long tail matters in total, but the head terms usually decide revenue.
Links. A few links from relevant, well-read sites often do more than hundreds from directories and networks.
How to find your 20%
- Pages. In Search Console and analytics, sort pages by clicks and by conversions over the last year. The top ten or twenty are where improvements pay most.
- Near misses. Find pages ranking in positions eight to twenty for valuable queries. They are close enough for modest work to move them onto page one.
- Blockers. Anything stopping important pages being crawled or indexed outranks everything else on the list.
- Template fixes. One change that applies to hundreds of pages beats a hundred changes to one page each.
I wrote a longer version of how I choose as if you only do three things, which three?
What goes in the 80%
The things that fill most SEO to-do lists and rarely change anything. Meta descriptions on hundreds of low-traffic pages; the HTTP Archive found that only 67.2% of pages have one and plenty of the rest rank fine. Alt text on decorative images. Chasing a tool’s site score to 100. Fixing heading order on pages nobody reads. Submitting to another fifty directories. Rewriting every product description.
None of those is wrong. They are just a poor use of the hours you have, until the important things are done.
The trap of applying it too literally
The 80/20 rule is a way of prioritising, not a license to ignore everything outside the top 20%. Some fixes in the long list matter enormously for specific pages. And sometimes the 20% you need is not the obvious one: a site that keeps publishing content may get more from fixing internal links to its existing pages than from any amount of new writing.
It also changes over time. Once the top issues are fixed, the next tier becomes the new 20%. Prioritisation is a habit, not a one-off exercise.
Why it matters more for small teams
Large companies can afford to work through long lists. Small teams cannot. If you have a few hours a week for SEO, the difference between spending them on the right three things and the wrong thirty is the difference between results and none.
That is most of what I do as a consultant. Most roadmaps I review are too long rather than too short. The value is in saying which items to drop.
A worked example
A local service business has a 120-page site and an audit report listing 340 issues. Sorted by what actually affects revenue, the list looks very different. The primary category on the Business Profile is wrong. The three service pages that bring in most enquiries have no internal links from anywhere except the menu. And a staging rule left the location pages set to noindex after the last redesign.
Those three items take a few hours to fix. Between them they probably account for most of what is holding the business back. The other 337 items include missing alt text on stock photos, a few title tags over sixty characters and some images without width attributes. Worth tidying one day. Not this month.
How to apply it every week
At the start of each week, ask one question: of everything we could do on the site, which single change would make the biggest difference to enquiries or sales? Do that first. Then the next one. Stop when the time runs out. It sounds obvious, and it is the opposite of how most SEO work is organised, which is by working through a checklist from the top.
Keep a short “not now” list as well. Writing down what you are deliberately ignoring stops it from creeping back onto the plan every time someone runs a new tool.
If your SEO to-do list has grown too long to act on, my SEO consulting turns it into a short, ranked list of what will actually move, and tells you what to stop doing.
More questions about SEO consulting
- What is an SEO consultant?
- How much does an SEO consultant cost?
- What is the difference between an SEO consultant and an agency?
- Are SEO agencies worth it?
- Is SEO still worth it in 2026?
See all 6 questions about SEO consulting or browse every SEO question I answer.
